75 Minutes to 25: Mumbai’s Biggest Connectivity Upgrade

GMLR aims to cut Goregaon–Mulund travel to about 20 minutes. See how it could affect property values.

12.2 km Road. 6.3 km Tunnel. Rs 14,000 Crore.

GMLR links Goregaon and Mulund through twin tunnels beneath Sanjay Gandhi National Park—Mumbai’s most ambitious infrastructure project.

GMLR Flyover Under Construction

The first flyover was targeted for May 2026 and is still being built. The full link is now expected by 2028.

Better Connectivity Can Support Property Demand

GMLR should cut east-west travel times for Goregaon West, which can support housing demand. Returns are not guaranteed.

Metro 2A + GMLR = Dual-Axis Connectivity

Metro 2A and GMLR together give Goregaon West unmatched north-south and east-west connectivity.

Vivere by Kolte-Patil: 2 Min from Metro, GMLR-Ready

Scenic-view residences at Bangur Nagar with 50+ amenities, open spaces, and seamless Metro + GMLR connectivity.

50+ Lifestyle Experiences Across Two Levels

From pickleball courts and pool lounges to yoga lawns and co-working spaces – 50+ amenities for an elevated lifestyle.

Explore Vivere at Goregaon West

2 & 3 bed scenic-view residences at Bangur Nagar. Discover premium living near the GMLR corridor in Goregaon West.

\n