| |
|
Adequate parking has been provided for two and four wheelers at two levels of basement |
| |
|
It consists of 3 numbers high speed of 15 passenger capacity. Main staircase and service staircase for office use is provided |
| |
|
Elegant landscape on ground and also on terrace area |
| |
|
A large cafeteria with adequate seating arrangement will be provided |
| |
|
Automatic Fire Detection and alarm system will be fixed at strategic location. Manual call point push button break glass type will be located on all landing level |
| |
|
Sump tanks for fire and domestic are to be housed in ground level |
| |
|
Centralized AC will be installed for shops and Central Atrium |
| |
|
Escalators are provided at central atrium |
| |
|
It will also be incorporated with water treatment plant and storm water disposal through rain water harvesting |
| |
|
Automatic Fire Detection and alarm system will be fixed at strategic location. Manual call point push button break glass type will be located on all landing level |
| |
|
Two way speakers will be installed at all floors to enable proper communication from different floors to control room |
| |
|
Power supply will be adequate along with back up to cater the needs of building service’s essential loads. Independent UPS power sub distribution board to be provided to server room as primary and secondary back up. Diesel Generator Sets will be provided with auto start and auto synchronizing panels |